تواصل مع BBP

نموذج الاتصال
24/7
CONTACT · BBP MANUFACTURING / 24/7 SUPPORT

Talk Directly to a Pump Engineer. Not a Sales Filter.

Send us your duty point, fluid characteristics, specific gravity and NPSH-available. You will receive a duty curve overlay, recommended series and up to two alternative configurations — within 24 business hours.

// Direct Line ONLINE 24/7
W
Wesley
International Sales · Engineering Liaison
بريد إلكتروني contact@bbpmfg.com
Hours 24 / 7 · 365 days · GMT+8 base
FOUR WAYS TO REACH US / 01

Pick the Channel That Fits Your Question.

Urgent shutdown? Use WhatsApp. Complex RFQ with attachments? Email. New project scoping? The inquiry form. Already shipped equipment from us? Direct line to Wesley.

CHANNEL / 01

Direct Phone

+86 182 1085 0516

Real-time during business hours. Best for quick technical questions and urgent follow-ups.

CHANNEL / 02

WhatsApp

+86 182 1085 0516

Fastest for international buyers. Send photos, drawings or voice notes — typically < 1 hour response.

CHANNEL / 03

بريد إلكتروني

contact@bbpmfg.com

For RFQ documents, detailed duty data sheets and project drawings. Replies within 24 business hours.

CHANNEL / 04

Office

Beijing · Fengtai District

Room 2803, Building 11, Phase II, Nuode Center, Fengtai District, Beijing, P.R. China.

RESPONSE SLA / 02 // <24h RFQ Engineering Response

A Working SLA,
Not a Marketing Promise.

Our 24/7 commitment is a working procedure, not a slogan. Sales and application engineering operate on overlapping shifts so that international buyers in mining, municipal, HVAC and process industries get an actual human technical reply inside one business day — regardless of timezone or holiday calendar.

For complex RFQs that require duty curve overlay and material selection, our engineers issue a formal engineering proposal within 48–72 business hours. Production lead times follow separately — typical 25 days for standard configurations.

WhatsApp
< 1 HOUR
Quick questions, drawing photos, urgent follow-ups
Phone
REAL-TIME
Real-time during 09:00–18:00 Beijing (GMT+8)
Email Inquiry
< 24 HOURS
Initial technical reply with clarifying questions
Formal RFQ
48–72 HOURS
Duty curve overlay · recommended series · alternatives
Custom OEM
5–7 DAYS
Engineering proposal with timeline & cost framework
PREPARE YOUR INQUIRY / 03

Five Data Points That Get You a Real Answer Fast.

Generic “please send me a quote” emails take a week of back-and-forth. Inquiries that include these five fields get an engineered response inside 24 hours.

Send Us Your Duty Point

The more of these five inputs you include, the faster our application engineers can map your service to a BBP series and quote a working configuration.

FIELD / 01 معدل التدفق m³/h or GPM Operating + design
FIELD / 02 إجمالي الرأس m or ft TDH including losses
FIELD / 03 Fluid Type Water · slurry · chemical Specific gravity, pH
FIELD / 04 Solids / Abrasion % w/w solids Max particle size
FIELD / 05 Service Context Industry · location Power available
Don’t have all five? Send what you have — our engineers will follow up with the missing inputs. Open Inquiry Form →
OFFICE LOCATION / 04

Beijing Headquarters.
Fengtai District.

BBP’s sales and engineering offices are headquartered in Beijing’s Fengtai District. Factory inspection and project meetings are scheduled with prior notice — we welcome buyers and engineering procurement teams to audit our production line before placing an order.

عنوان
غرفة 2803، المبنى 11، المرحلة الثانية، مركز نود، منطقة فنغتاى، بكين، جمهورية الصين الشعبية
Office Hours
Monday – Friday · 09:00 – 18:00 (GMT+8) WhatsApp & Email · 24/7 monitored
Visiting
Factory tours by appointment. Email to schedule
Languages
English · 中文
BEFORE YOU CONTACT / 05

Questions We Hear Most
Before the First Email.

Quick answers to the procedural questions that come up before a buyer’s first inquiry. For technical FAQs about specific pump lines, see the relevant product page.

Q.01

How fast will I get a reply to my first inquiry?

WhatsApp replies typically arrive within an hour. Email RFQs receive an initial technical response inside 24 business hours. Formal engineering proposals — including duty curve overlay, recommended series and alternative configurations — are issued within 48–72 hours of receiving a complete duty point.

Q.02

Do I need to submit through the inquiry form, or can I email directly?

Both routes reach the same engineering team. The form is useful if you don’t yet have all the duty data organized — it prompts you for the right fields. Direct email to contact@bbpmfg.com is faster when you already have a specification sheet or drawings to attach.

Q.03

Can I visit the BBP factory before placing an order?

Yes — factory audits are welcomed and encouraged for engineering procurement teams. Email us in advance so we can schedule access to the foundry, machining center and inspection lab. Our Beijing headquarters and production facility are reachable from Beijing Capital International Airport and Beijing Daxing International Airport.

Q.04

What languages does the BBP team work in?

All international correspondence — email, WhatsApp, technical documentation, RFQ responses — is handled in English. Mandarin Chinese is also available for buyers sourcing from the China region. Technical drawings follow ISO conventions.

Q.05

Do you handle OEM / ODM projects directly?

Yes. OEM and ODM are standard offerings, not project-scale exclusions. Engineering proposals for custom impeller geometry, alternate volute configurations, integrated skid packages with VFD controllers, or private-label branding follow our four-step workflow: RFQ, engineering proposal, sample / prototype evaluation, then production.

Q.06

How do I request a spare part for an existing BBP pump?

بريد إلكتروني contact@bbpmfg.com with your pump’s traceability code (the unique ID stamped on every BBP unit at delivery) and the part description. Common wear parts — impellers, throat bushings, shaft sleeves, rubber liners, mechanical seal kits — are held in stock and ship in days. Engineered parts take 30–45 days from PO.

// START THE CONVERSATION

Ten Pump Categories.
One Engineering Conversation.

Whether you’re scoping a single mining slurry replacement or sourcing a multi-line municipal package, the inquiry path is the same: send your duty point, get a working configuration inside 24 business hours.