Get in Touch with BBP

Contact Form

Construction Dewatering ROI Calculator — Trash Pump vs Under-Spec Alternative

Estimate the field-service labor and replacement-pump cost you avoid by specifying a trash pump correctly. Driven by 2024 US construction labor benchmarks (BLS OES) and BBP field-service practice.

Typical construction dewatering contracts run 3–12 months
Continuous 24/7 = 720 hrs; single-shift weekdays ≈ 160; typical site ≈ 300
BLS May 2024 operator median wage $28/hr direct; loaded rate adds equipment, fuel, overhead
Enter your project details and click calculate.