Multistage Pump 15-Year TCO Calculator
Estimates 15-year total cost of ownership using the Hydraulic Institute / Europump LCC framework. Inputs are duty point, run hours and electricity rate. Output is purchase + energy + maintenance + downtime.
Duty Point & Operation
QDL/QDLS at BEP: 65–75%
IE3 ≈ 92%, IE4 ≈ 95%
Cost Inputs
Routine seal change, spares
Lost prod. × MTBF probability
Enter duty point and cost inputs to generate lifecycle cost analysis.
15-Year Total Cost of Ownership
—
—
| Shaft power requirement | — |
| Annual energy cost | — |
| Energy share of LCC | — |
| Initial price share of LCC | — |
Implication
—
Request Project-Specific TCO Worksheet →
Methodology: Pump shaft power P = (Q × H × ρg) / (ηp × ηm), with ρg = 9.81 (water at standard conditions). Lifetime energy = P × hours × years × rate. The split percentages reflect Hydraulic Institute / Europump LCC field averages: initial purchase typically 10%, energy 30–35%, maintenance 18–22%, downtime + disposal 35–40% over 15-year service for industrial multistage applications.